Granite SR-99 Pre-bid Event
Granite SR-99 Pre-bid Event
Join the Project team to learn about working with them through the project’s CMGC process as well as upcoming prospective scopes to carry out these major works:
· Construct six (6) 12-foot lanes (3 lanes each direction) with Continuously Reinforced Concrete Pavement (CRCP)
· Construct a 46-foot paved median with standard 10-foot inside shoulders, and standard 10-foot outside shoulders with Hot Mix Asphalt (Type A).
· Construct auxiliary lanes on the NB and SB directions from SR 99/180 connectors to Olive Ave and from Olive Ave to Clinton Ave.
· Construct retaining walls and soundwalls at various locations.
· Replace the existing concrete median barrier to current standards.
· Construct pumping plants adjacent to Kerman Branch UP and Olive Ave OC.
· Remove the following bridge: Teilman Ave/Pacific Ave OC
· Replace the following bridges: El Dorado St OC, Kerman Branch UP, Belmont Ave UC, and Olive Ave OC.
· Widen the following bridges on both the NB and SB directions: Nielsen Ave UC and McKinley Ave UC.
· Close the following ramps: Belmont Ave and McKinley Ave ramps.
· Construct a standard diamond interchange with roundabouts at the ramp terminals at Olive Ave.
This meeting will take place online via zoom. Details to be provided prior to the event.
This is a free event. To fully register for this event, you must complete the Checkout process. You do NOT need to enter your credit card information to register. Leave the credit card field BLANK and enter your billing address. If you do not receive a confirmation email, you have not completed the registration for this event. If you have any questions or are having trouble registering, please email rebecca@cpmlogistics.net.